Dry mortar equipment parts of the cleaning and installation order
When using dry mortar equipment, you must also clean the parts when you use them. Let me take you all along to find out!
Parts in dry mortar equipment are usually paraffin when cleaning. Be careful not to use petrol.
Secondly, hydraulic hoses can be sprayed with a high velocity fluid stream and hard pipes can be cleaned in the same way.
Thirdly, hydraulic components should be cleaned at the factory and sealed with plastic plugs. If stored for less than two years, there is no need to clean the inside of the components.
Fourthly, parts of high-precision hydraulic components can be cleaned by ultrasonic methods.
Dry mortar equipment installation sequence
1. Before transporting the dry mortar equipment to the site, the scale and size of the site must be measured, followed by the raw material tank and construction work platform;
2. Once the equipment arrives at the site, it needs to be lifted and installed in a top-to-bottom sequence. The mixing equipment includes: the twin shaft gravity mixer, the finished product warehouse and the packaging machine;
3. After lifting the main equipment, the weighing equipment, bucket elevator, conveying screw, dust collector, air compressor and control system are lifted one by one;
4. After all equipment has been suspended, docking work must be carried out. Here we must pay attention to the sealing and connection between the equipment;
5. After the docking work is completed, it is necessary to start the commissioning work to check whether the components can operate normally, and then put them into use after there are no problems.