Dengzhou Longyi Machinery  Co., Ltd

Dengzhou Longyi Machinery Co., Ltd

Dry mortar equipment single work load can not exceed the number of specified equipment

2021 10/27

Dry mortar equipment single work load can not exceed the number of specified equipment

Before we start the dry mortar equipment, pay attention to: first open the observation port of each equipment, discharge port, feed port, etc., to observe whether there are residues and debris. If the dry-mixed mortar equipment before the start of work shall be strictly removed, it is strictly forbidden to put hands, hard objects and debris into the equipment during the work.

In order to prolong the service life of the dry mortar equipment motor, the power supply of the dry mortar equipment must be earthed during operation. After turning on the dry mortar equipment, it will take 5-10 minutes to allow the hot machine to idle. No abnormalities are found in the hot machine before it can be used for production.
To ensure the safety of personnel during production, each dry mortar plant control switch shall be protected from leakage. Testing and repairing of the equipment and commissioning work by non-professionals is strictly prohibited. After the dry-mix mortar equipment has been started, it is important to pay attention to the working direction of the equipment and whether it conforms to the prescribed direction, otherwise damage will be caused to the dry-mix mortar equipment. After the equipment is put into use, the equipment must be regularly maintained in order to improve the efficiency and extend the service life of the equipment.
Dry mortar equipment must be installed in a place that is easily ventilated and dry, and the surrounding environment must be kept clean. Regularly check the tightness of the drive belt and screws at the joints and make appropriate adjustments. The dry mortar plant is a gap mixing plant. Please note that individual work loads should not exceed the specified number of units. The start-up of the dry mix mortar equipment should be strictly followed for air machines.
When the dry mortar plant is in use the dosage unit system is started so that the silo can be fed quickly to a predetermined value and then the feed is stopped. The feeding unit then starts to continue feeding and slowly decelerates to a stop as it slowly approaches the specified value. At the same time, the speed of the discharge unit is switched off to stop the possible collapse of the material. During operation, depending on the user's operating habits, manual feeding can be selected on the machine's operating system. After completion of the entire metering chamber, the valve in the bottom of the chamber is fully opened and the entire measurement chamber of material enters the mixing mainframe by gravity. After the complete discharge of the material has been completed, the warehouse instruments are reset to zero, the bottom valve closes automatically and the dry mortar plant is once again in the dosage phase.