Dengzhou Longyi Machinery  Co., Ltd

Dengzhou Longyi Machinery Co., Ltd

Mortar raw materials will affect the products produced by dry-mixed mortar equipment

2021 10/26

Mortar raw materials will affect the products produced by dry-mixed mortar equipment

Purchase qualified products. If the dry-mixed mortar equipment fails, the seal may not be satisfactory. If the seal is not tight, the product may leak. On the other hand, other substances may be mixed into the equipment and therefore impurities may be present in the product.
Good raw material management. Dry mortar raw materials can affect the quality of the product. If raw materials contain impurities, it is impossible to avoid impurities in the product produced. In addition, care should be taken to store raw materials so that they and other substances are not contaminated.
If you are using a unit to produce two products, clean the internal cleaning of the equipment and the surfaces of the equipment after pre-production. Manage product storage at each stage to avoid mixing other impurities into the material.
A strong foundation must be installed on the dry-mix mortar plant at the time of installation. The loading platform and the height of the loader and equipment need to be retained and adjusted. If the height of the equipment is 2 metres, 3.5 metres should be reserved when constructing the shelter. The appointment can only be put into production after acceptance.
Operators of dry-mix mortar equipment are subject to professional training. Certification can only be carried out by examination and not without a licence. The equipment should be checked in advance to confirm that all parts are accessible and if problems are found, they should be repaired immediately.
If the dry mortar equipment suddenly fails during operation, turn off the power immediately, pour the mortar into the mixing tank for maintenance and wait until the problem has been removed before continuing production. Do not use wooden sticks, iron bars or other tools to enter the equipment to clean the material when it is in operation. Turn off the power before operation. When cleaning is complete, lock the switch box and clean the site.