Dry mortar equipment working procedures and how to operate

2021 10/20

Dry mortar equipment working procedures and how to operate

1, before the test machine must first set of dry mortar equipment all reducer refueling (according to the standard), this dry mortar equipment need refueling single machine are: ① conveyor pump reducer ② batching weighing hopper ③ bucket lifting machine ④ double shaft mixer ⑤ finished silo reducer ⑥ air compressor, etc.

2, connect all the motor lines, pneumatic control line connected to the distribution cabinet, and then test turn one by one, adjust the steering, the batching scale, valve packaging machine after commissioning, ready for production.

3, first open the bucket elevator, air compressor, dust collector, start the dosage weighing bucket to start working, and will be well-matched materials from the bucket to lift to be mixed bin.

4, start the dual-axis gravity mixer, in the start of the finished product bin motor.

5, dual-axis gravity mixer work 3-5 minutes after the start of the finished bin power, open the valve of the dual-axis gravity mixer to put the material into the finished bin for packaging.

6, when the pneumatic valve button is released, the pneumatic door closes and the bucket elevator is started for the second batch of feeding.

Cycle in turn to complete the required output (work dual-shaft gravity-free mixer as well as the finished product bin has been running work).